了解如何通过优化基于重量的灌装系统的准确度来节省成本:
币种:
灌装重量单位:
目标灌装重量(选定单位)
当前过度灌装(故意或由于秤误差),单位为 %

%
材料成本(选定单位)
/
每天的重量数量
每周工作日
每年工作日:
Comparison of your current installation with three options with higher accuracy:
Current Scale_% |
Scale 1_% |
Scale 2_% |
Scale 3_% |
||
---|---|---|---|---|---|
Target Fill weight (in selected unit) | |||||
Current overfill (on purpose or due to error of scale) in % | % | ||||
Loss per weighment | |||||
Material loss per day | /day | ||||
Material loss per week | /week | ||||
Material loss per year | /year | ||||
Revenue loss per day | /day | ||||
Revenue loss per week | /week | ||||
Revenue loss per year | /year | ||||
Savings | |||||
Savings | % | % | % | % |